Yarda | floors in rooms, the cooridors, and offices |
---|---|
Ubicación | Olten, Suiza |
Subcategoría | VILLA DE RETIRO/ DEPARTAMENTOS |
Aplicación |
All floors were laid with hard coverings. For the construction joints Primer MF EC Plus and Quarzo 0.9 were used. The anhydrite subfloors were primed with Eco Prim T Easy before being fully leveled with Ultraplan Eco.
Once the levelling compound had dried, the rooms were laid with LVT flooring and bonded with Ultrabond Eco V4SP Fiber. The corridors, offices and reception rooms were laid with Forbo Step PVC sheeting (extra slip-resistant flooring) and also bonded with Ultrabond Eco V4 SP Fiber. |
Fecha de inicio y finalización | 2023 |
Tipo de aplicación | Recubrimientos en pisos |
Empresa contratista | WSG AG, Basel |
Empresas instaladoras | Inevo AG, Pratteln |
Arquitectos | Fsp architekten, Spreitenbach |
Gestor de proyectos | Tertianum Management AG, Dübendorf |
Coordinación de MAPEI | Patrick Zengaffinen |