Yarda | Mapei preparation and fixing products have been used to complete a surface installation at Nottingham Trent University’s Health & Allied Professions Centre. |
---|---|
Ubicación | Nottingham Trent, Reino Unido |
Subcategoría | HOSPITAL |
Aplicación |
The project, which was completed by Sheffield-based tiling contractor, W F Fearn Ltd, for Henry Brothers Midlands, included installation of porcelain wall and floor tiles throughout the centre’s atrium and wash rooms.
The recent works carried out by W F Fearn spanned a total floor area of 1600m2. Prior to installation of the new tile finishes, the atrium floors were primed with low VOC resin primer - Primer G, before being smoothed with Mapei’s fibre-reinforced smoothing compound, Ultraplan Renovation Screed 3240. Mapetex anti-fracture membrane was then installed with Keraquick S1, – a quick-setting, very low VOC deformable cementitious adhesive - and Latex Plus admixture for increased flexibility to S2 classification. Tiles were installed with Keraflex Maxi S1 deformable standard setting cementitious adhesive. |
Fecha de inicio y finalización | 2021 |
Tipo de aplicación | Tile & stone installation systems, Recubrimientos en pisos |
Empresa contratista | W F Fearn Ltd |
Empresas instaladoras | Henry Brothers Midlands |
Créditos | Pick Everard, Nottingham Trent Uni and Martine @builtvision |