Renovation work at Victoria Centre

Location icon Hong Kong
Ref #: 852112
Category: COMMERCIAL FACILITIES

Construction

Yard 15 Watson Road, North Point
Location Hong Kong
Subcategory OFFICES
Application Installation & grouting of ceramic tiles, reconstituted stones and natural stones.
Start and finish date 2013/2014
Application Type Floor/wall coverings
Client Victoria Centre
Contractor company Earfinterior Designers
Architects Earfinterior Designers
MAPEI Distributor Mapei China Ltd.

Product used for the project

GRANIRAPID
GRANIRAPID
DESCRIPTION: High performance, deformable, fast setting and hydration…
KERALASTIC T
KERALASTIC T
TECHNICAL DATA: Open time: 50 minutes. Waiting time before grouting: 12 hours.…
KERAPOXY
KERAPOXY
Two-component, high-performance, anti-acid epoxy mortar and adhesive with no…
KERAPOXY ADHESIVE
KERAPOXY ADHESIVE
TECHNICAL DATA: Pot life of mix: 45 minutes. Open time: 60 minutes. Set to…
ULTRACOLOR PLUS
ULTRACOLOR PLUS
High-performance, anti-efflorescence, quick-setting and drying polymer-modified…

Keep in touch

Subscribe to our newsletter to get Mapei news