Museum of the Future

Location icon Dubai, United Arab Emirates
Ref #: 42057
Category: TOURISM AND WELLNESS

Construction

Yard Epoxy flooring system, Tile adhesive and Grout, Floor Screed
Location Dubai, United Arab Emirates
Subcategory MUSEUM
Built in 2022
Opened in 2022
Application Interior and Exterior works
3D Wall brick application in the Reception Area and Tiling work - Bathroom and Common Areas.
Start and finish date 2019/2021
Application Type Floor/wall covering
Contractor company BAM INTERNATIONAL
Installer companies DEEMAH STONE
Architects AECOM AND KILLA DESIGN

Product used for the project

GRANIRAPID
GRANIRAPID
DESCRIPTION: High performance, deformable, fast setting and hydration…
KERAPOXY
KERAPOXY
Two-component, high-performance, anti-acid epoxy mortar and adhesive with no…
KERAPOXY ADHESIVE
KERAPOXY ADHESIVE
TECHNICAL DATA: Pot life of mix: 45 minutes. Open time: 60 minutes. Set to…
MAPESIL AC
MAPESIL AC
Pure, mould-resistant, acetic silicone sealant with BioBlock ® technology for…
MAPESIL LM
MAPESIL LM
Neutral silicone mould-resistant sealant with BioBlock ® technology for stone…
PRIMER SN
PRIMER SN
TECHNICAL DATA: Mixing ratio: component A : component B = 80 : 20. Colour of…
TOPCEM
TOPCEM
TECHNICAL DATA: Recommended mixing ratio: 200÷250 kg of TOPCEM with 1 m³ of…
ULTRACOLOR PLUS
ULTRACOLOR PLUS
High-performance, anti-efflorescence, quick-setting and drying polymer-modified…
FUGOLASTIC
FUGOLASTIC
Product not available for this market,
contact us
74 - KERAFLEX MAXI S1
KERAFLEX MAXI S1
Product not available for this market,
contact us
2015 - MAPEFLOOR I 300 SL
MAPEFLOOR I 300 SL
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news