Kuala Lumpur International Airport 2 (KLIA2)

Location icon Sepang, Malaysia
Ref #: 60000028
Category: INFRASTRUCTURES

Construction

Yard Kuala Lumpur International Airport 2 (KLIA2)
Location Sepang, Malaysia
Subcategory AIRPORT
Built in 2013
Opened in 2013
Application Kuala Lumpur International Airport 2 (KLIA2)
Start and finish date 2013
Application Type Floor/wall coverings
Client Malaysia Airports Holding Berhad
Contractor company WCT Construction S/B & UEMC-Bina Puri
Installer companies Hon & Cheah Construction & Tiling Sdn Bhd / Sun-Trident Sdn Bhd
Architects Arkitek AAP
MAPEI Distributor Mapei Malaysia Sdn Bhd
Other MAPEI tiling installation in Kuala Lumpur International Airport 2 (KLIA2) Integrated Complex. Integrated complex comprises the transportation hub, Express Rail Link terminal, shopping mall, boarding and departure lounges and linkway passages. The Client wanted a top-of-the-range tile adhesive that is able to withstand the stresses of heavy traffic of people, trolleys and electric carts.

Product used for the project

131 - KERACOLOR FF
KERACOLOR FF
Product not available for this market,
contact us
74 - KERAFLEX MAXI S1
KERAFLEX MAXI S1
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news