Hotel Marriott

Location icon Brno, Czech Republic
Ref #: 201630
Category: TOURISM AND WELLNESS

Construction

Yard Hotel Marriott
Location Brno, Czech Republic
Subcategory HOTEL/INN
Built in 2016
Opened in 2016
Application Hotel Marriott
Start and finish date 2016
Application Type New building
Client CTP
Contractor company Koberce Breno
Installer companies Bripo

Product used for the project

EPORIP
EPORIP
Technical data: Pot life: 60 minutes. Open time: 5 hours. Setting time: 24…
LATEX PLUS
LATEX PLUS
Latex admixture inducing elasticity to be mixed with Keraquick. Applications:…
MAPESONIC CR
MAPESONIC CR
TECHNICAL DATA: Thickness: 2 mm and 4 mm. Format: – 20 x 1 m sheets (2 mm…
NIVORAPID
NIVORAPID
Ultra-fast drying thixotropic cementitious levelling mortar, also suitable for…
PRIMER MF
PRIMER MF
Two-component solvent-free epoxy primer to be used as an adhesion promoter for…
ULTRABOND ECO S955 1K
ULTRABOND ECO S955 1K
TECHNICAL DATA: Consistency: creamy paste. Colour: beige. Open time: 50-60…
ULTRAPLAN ECO
ULTRAPLAN ECO
Ultra-fast hardening self-levelling smoothing compound with very low VOC…
PLANIPATCH
PLANIPATCH
Product not available for this market,
contact us
PRIMER G
PRIMER G
Product not available for this market,
contact us
2916 - ECO PRIM GRIP
ECO PRIM GRIP
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news