Cruiser maintenance at PISCES

Location icon Hong Kong
Ref #: 852066
Category: INFRASTRUCTURES

Construction

Yard The Hong Kong United Dockyard, Tsing Yi, N.T. (on the cruiser)
Location Hong Kong
Subcategory SHIP
Application Installation of ceramic tiles & resilient coverings
Start and finish date 2013
Application Type Floor/wall coverings
Client Star Cruises
Contractor company Synkronex OY
Installer companies Synkronex OY
MAPEI Distributor Mapei China Ltd.
Link to details page http://www.mapei.com/adv/HK/SuperStar_Aquarius_Star_Pisces_cruiser/

Product used for the project

KERALASTIC T
KERALASTIC T
TECHNICAL DATA: Open time: 50 minutes. Waiting time before grouting: 12 hours.…
ULTRATOP
ULTRATOP
Description Ultra-quick setting self-levelling mortar based on special…
ROLLCOLL
ROLLCOLL
Product not available for this market,
contact us
ULTRABOND ECO 380
ULTRABOND ECO 380
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news