Cruiser maintenance at PISCES

Location icon Hong Kong
Ref #: 852066
Category: INFRASTRUCTURES

Construction

Yard The Hong Kong United Dockyard, Tsing Yi, N.T. (on the cruiser)
Location Hong Kong
Subcategory SHIP
Application Installation of ceramic tiles & resilient coverings
Start and finish date 2013
Application Type Floor/wall coverings
Client Star Cruises
Contractor company Synkronex OY
Installer companies Synkronex OY
MAPEI Distributor Mapei China Ltd.
Link to details page http://www.mapei.com/adv/HK/SuperStar_Aquarius_Star_Pisces_cruiser/

Product used for the project

KERALASTIC T
KERALASTIC T
TECHNICAL DATA: Open time: 50 minutes. Waiting time before grouting: 12 hours.…
ULTRATOP
ULTRATOP
Description Ultra-quick setting self-levelling mortar based on special…
ULTRABOND ECO 380
ULTRABOND ECO 380
Product not available for this market,
contact us
222 - ROLLCOLL
ROLLCOLL
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news