NZT04 - System for the Installation of Timber Floor Coverings Over a Moisture Vapour Barrier

Commercial building
Internal flooring
Installation of wooden flooring; Application of finish for wooden flooring

Please download the Work Method Statement PDF for the complete list of suitable products and installation information

Application steps

1
Concrete substrate
2
Moisture vapour barrier
3
Timber adhesive
4
Timber flooring
Work Method Statement
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news