NZT03 - System for the Installation of Engineered Timber Flooring Over Acoustic Matting on a Concrete Substrate

Commercial building
Internal flooring
Installation of wooden flooring; Application of finish for wooden flooring

Please download the Work Method Statement PDF for the complete list of suitable products and installation information

Application steps

1
Concrete substrate
2
Moisture vapour barrier
3
Primer
4
Self-levelling compound
5
Acoustic underlay adhesive
6
Acoustic underlay
7
Timber adhesive
8
Pre-finished engineered timber flooring
Work Method Statement
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news