NZR13 - System for Installing LVT Planks over Existing Ceramic Tiles

Commercial building
Internal flooring
Installation of textile flooring; Installation of resilient flooring; Installation of LVT

Please download the Work Method Statement PDF for the complete list of suitable products and installation information

Application steps

1
Existing tiles
2
Primer
3
Levelling compound
5
LVT planks
Work Method Statement
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news