NZR12 - System for the Installation of Carpet Tiles on Uneven Concrete with High Residual Moisture

Commercial building
Internal flooring
Installation of textile flooring; Installation of resilient flooring; Installation of LVT

Please download the Work Method Statement PDF for the complete list of suitable products and installation information

Application steps

1
Existing uneven concrete
2
Moisture vapour barrier
3
Primer
(undiluted)
4
Levelling compound 
(if required)
6
Vinyl or vinyl-backed carpet tiles
Work Method Statement
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news