NZR06 - System for the Installing Vinyl Floor Coverings Over Concrete with High Residual Moisture

Commercial building
Internal flooring
Installation of textile flooring; Installation of resilient flooring; Installation of LVT

Please download the Work Method Statement PDF for the complete list of suitable products and installation information

Application steps

1
Properly prepared concrete substrate
2
Moisture vapour barrier
3
Primer
4
Levelling compound
5
Adhesive
6
Vinyl floor covering 
7
Adhesive for covering
Work Method Statement
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news