NZR03 - System for Installing Dual Bond Carpet Over a Concrete Substrate

Old Building
Internal flooring
Installation of textile flooring; Installation of resilient flooring

Please download the Work Method Statement PDF for the complete list of suitable products and installation information

Application steps

1
Properly prepared concrete substrate
2
3
Dual bond underlay
4
Adhesive
5
Textile floor covering
Work Method Statement
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news