The only flooring adhesive you need in the back of your van. Rapid and strong initial tack, very long open time, good dimensional stability, strong and tenacious final adhesion: the best performance in a single formula.
ADVANTAGES
Consistency: creamy paste.
Colour: light beige.
Waiting time: 10-20 minutes (30-40 minutes on low/non-absorbent substrates).
Open time: 60-70 minutes (up to 120 minutes on non-absorbent substrates).
Set to light foot traffic: 3-5 hours.
Ready for service: 24-48 hours.
EMICODE: EC1 Plus - very low emission.
Storage: 12 months. Protect from frost.
Application: N° 1, 2, 3 MAPEI trowels, TKB A1, A2, B1, B2, roller.
Consumption: 200-450 g/m².
Packaging: 14 and 16 kg drums.
PUBLIC BUILDINGS AND PLACES
North Tyneside, United Kingdom
Installation of floors
PUBLIC BUILDINGS AND PLACES
East Yorkshire, United Kingdom
Installation of floors
PUBLIC BUILDINGS AND PLACES
Bari, Italy
Cementitious & resin flooring systems
PUBLIC BUILDINGS AND PLACES
Veszprém, Hungary
Installation of floors, Waterproofing systems
PUBLIC BUILDINGS AND PLACES
Braga, Portugal
Concrete restoration systems, Installation of floors
PUBLIC BUILDINGS AND PLACES
North Tyneside, United Kingdom
Installation of floors
PUBLIC BUILDINGS AND PLACES
East Yorkshire, United Kingdom
Installation of floors
PUBLIC BUILDINGS AND PLACES
Bari, Italy
Cementitious & resin flooring systems
PUBLIC BUILDINGS AND PLACES
Veszprém, Hungary
Installation of floors, Waterproofing systems
PUBLIC BUILDINGS AND PLACES
Braga, Portugal
Concrete restoration systems, Installation of floors