TECHNICAL DATA:
Recommended mixing ratio: 200÷250 kg of TOPCEM with 1 m³ of aggregates (diameter from 0 to 8 mm) and 120-140 kg of water for dry inerts.
Workability time: 40÷60 minutes.
Set to light foot traffic: after 12 hours.
Waiting time before laying: 24 hours for ceramic tiles, 2 days for natural stone and 4 days for resilient and wood coverings.
Residual humidity after 4 days: less than 2%.
EMICODE: EC1 R Plus - very low emission.
Storage: 12 months.
Application: tapping and flattening with a straight edge.
Consumption: 2-2.5 kg/m² per cm of thickness.
Packaging: 20 kg bags.
SPORT FACILITIES
Malbork, Poland
Concrete restoration systems, Tile & stone installation systems, Waterproofing systems
PUBLIC BUILDINGS AND PLACES
City of Požega, Croatia
Products for structural strengthening
PUBLIC BUILDINGS AND PLACES
Barcelona, Spain
Cementitious & resin flooring systems, Products for structural strengthening
TOURISM AND WELLNESS
Lajoskomarom, Hungary
Floor/wall coverings
SPORT FACILITIES
Malbork, Poland
Concrete restoration systems, Tile & stone installation systems, Waterproofing systems
PUBLIC BUILDINGS AND PLACES
City of Požega, Croatia
Products for structural strengthening
PUBLIC BUILDINGS AND PLACES
Barcelona, Spain
Cementitious & resin flooring systems, Products for structural strengthening
TOURISM AND WELLNESS
Lajoskomarom, Hungary
Floor/wall coverings