Yard | Tunnel realization |
---|---|
Location | Xiamen, China |
Subcategory | TUNNEL |
Built in | 2005 |
Opened in | 2006 |
Application | Undersea tunnel realization |
Application Type | Admixtures for concrete |
Contractor company | China Tunnelling; Railway Bureau 18, Railway Bureau 1; Railway Bureau 4 |