Yard | Business Park |
---|---|
Location | Singapore |
Subcategory | SHOPPING CENTER |
Built in | 2014 |
Opened in | 2016 |
Application | installation of ceramics and stone materials inside and outside |
Start and finish date | 2015/2016 |
Application Type | Floor/wall coverings |
Client | Shimizu Corporation |
Contractor company | Shimizu Corporation |
Installer companies | CSC Holdings Limited, Yangzijian International (S) Pte Ltd |
Architects | DCA Architect |
MAPEI Distributor | Mapei Far East Pte Ltd |
MAPEI Coordination | Ryan Liaw (Mapei Far East, Singapore) |
Other | Soon after the completion of MBC phase 1, major issues on the tile bonding surfaced. Installation materials were supplied by Laticrete. Tiles from the toilets debonded causing potential danger. At the request of the owner, Mapei did a thorough site inspect |
Here you can download all documents related to this project