The Cocoa Works

Location icon York, United Kingdom
"참조 #": 20122024
"Category": RESIDENTIAL BUILDINGS

"건축"

"Yard" A Mapei resilient flooring system has been used to complete an extensive project at The Cocoa Works in York.
"Location" York, United Kingdom
"Subcategory" APARTMENTS
"Application" Installed by Titan Flooring, the project spanned apartment living rooms, bedrooms and corridors throughout the luxury redevelopment, on the site of the former iconic Rowntree Factory.
The project was completed by Henry Boot Construction for Latimer – the development arm of Clarion Housing Group. Originally dating back to the 1890s, the Rowntree Factory is located on an eight-hectare site of historical significance. Derelict for over a decade, the building has been sensitively restored, with the new characterful-contemporary design embracing original features throughout. Designed by Weedon Architects, the building includes 279 luxury one, two and three-bed apartments surrounded by landscaped gardens and external spaces. Floor preparation works were completed throughout the historic site using two Mapei products. They included ECO Prim T Plus universal acrylic primer and Ultraplan Renovation Screed 3240 – a fibre-reinforced smoothing compound. Both the primer and screed feature very low VOC EMICODE: EC1 Plus formulations.
"Application Type" Flooring
"Contractor company" Henry Boot Construction
"Installer companies" Titan Flooring
"Architects" Weedon Architects
"Project Manager" Latimer – the development arm of Clarion Housing Group

"프로젝트에 사용 된 제품 "

ECO PRIM T PLUS
ECO PRIM T PLUS
Product not available for this market,
contact us
Ultrabond Eco Tack TX+
Ultrabond Eco Tack TX+
Product not available for this market,
contact us
ULTRABOND ECO TX3
ULTRABOND ECO TX3
Product not available for this market,
contact us
ULTRABOND ECO VS90 PLUS
ULTRABOND ECO VS90 PLUS
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news