"Yard" | Hotel of Pineapple Hospitality chain |
---|---|
"Location" | San Francisco, USA |
"Subcategory" | HOTEL/INN |
"시공 시기" | 2015 |
"오픈 시기" | 2016 |
"Application" | supply of products to prepare substrates, waterproof floors and walls and to install tiles in the bathrooms |
"Start and finish date" | 2015/2016 |
"Application Type" | Flooring |
"Owner" | Pineapple Hospitality |
"Contractor company" | CCI General Contractor |
"Installer companies" | Rubenstein’s |
"Architects" | Glenn Texeira – Stanton Architecture |
"MAPEI Distributor" | Systematic Supply |
"Credits" | Michael Bradford and Raul Ballester |
Project Manager | Michael Bradford – Rubenstein’s |
"마페이 조정" | Chris Anderson (Mapei Corporation) |
"설명" | MAPEI’s ShowerPerfect ™ LM Installation Kits were used to make tub-to-shower conversions in 93 guest bathrooms at Hotel Grace in San Francisco. Mapelastic® AquaDefense membrane was used for waterproofing. Marble was installed over the ShowerPerfect systems, and MAPEI products were used throughout the rest of the bathrooms as well as the lobby, stairs and bar. |