"Yard" | double road bridge |
---|---|
"Location" | Bucharest, Romania |
"Subcategory" | BRIDGE |
"시공 시기" | 2010 |
"오픈 시기" | 2014 |
"Application" | application of anti-carbonation protection coat |
"Start and finish date" | 2014 |
"Application Type" | Facades maintenance |
"Owner" | BUCHAREST CITY HALL |
"Contractor company" | ASTALDI SPA |
"Installer companies" | ASTALDI SPA |
"MAPEI Distributor" | ASTALDI SPA |
"설명" | Two parallel passages for each sense, one with a length of 675.4 meters and the second with a length of 687.7 meters. The width of the two bridges is 7.8 meters. The contribution of MAPEI was to protect concrete structures against carbonation using the mos |