"Yard" | Sabah Ammonia Urea Plant |
---|---|
"Location" | Sipitang, Malaysia |
"Subcategory" | PLANT |
"시공 시기" | 2014 |
"오픈 시기" | 2015 |
"Application" | Tank Lining & Waterproofing |
"Application Type" | Waterproofing |
"Owner" | Petronas Chemicals Group Berhad |
"Contractor company" | Mitsubishi Heavy Industries / Apex Energy Sdn Bhd / PT Rekayasa Industri Consortium |
"Installer companies" | Hycrete Mecure Sdn Bhd |
"Architects" | Architect HaoYun |
"MAPEI Distributor" | Mapei Malaysia Sdn Bhd |
"설명" |
Construction of Petronas Chemicals Group Bhd’s Ammonia Urea Complex in Sipitang- Sabah started in mid-2012. The RM5 billion BEPCC contract – Basic and Detailed Engineering, Procurement, Construction and Commissioning – was undertaken by a consortium comprising Mitsubishi Heavy Industries, Apex Energy Sdn Bhd and PT Rekayasa Industri. The SAMUR Project involves the development of a new fertiliser plant with urea production capacity of 1.2 million metric tons per annum (mmtpa). The plant will be located on 166 acres of land in the Sipitang Industrial Park, Sabah. Also known as the SAMUR Project, the complex located in the Sipitang Oil & Gas Industrial Park comprises an ammonia plant, a urea plant, a granulation plant, integrated utility units and jetty facilities. Completion is scheduled for February, 2016. Besides waterproofing for the roof slab, a highly chemical-resistant and abrasion-resistant lining was required for the ammonia processing plant’s cooling tower. Mapei Products: PRIMER SN, MAPECOAT VE825 AP, MAPETEX GRP225, PLASTIMUL MY, MAPETHENE TA 3MM |