"Yard" | The bridge was repaired. |
---|---|
"Location" | Schoried, Switzerland |
"Subcategory" | BRIDGE |
"Application" | The bridge, built in 1934, was repaired in 2020. |
"Start and finish date" | 2020 |
"Application Type" | Structural reinforcement |
"Installer companies" | Bürgi Bau AG |
"마페이 조정" | Stephan Moosmann |