"Yard" | interior areas and swimming-pool |
---|---|
"Location" | Abu Dhabi, United Arab Emirates |
"Subcategory" | PARK |
"시공 시기" | 2008 |
"오픈 시기" | 2010 |
"Application" | supplying products for preparing, waterproofing and levelling the substrates; for laying ceramic and stone materials on walls and floors; for bonding wallpaper and PVC floorings; for sealing the anchoring points within steel structures |
"Start and finish date" | 2009/2010 |
"Application Type" | Installation of floor and wall coverings |
"Owner" | Aldar Properties PJSC |
"Contractor company" | Aldar Besix (EAU) |
"Installer companies" | DEPA (EAU) |
"Architects" | John Robertson Architects (USA), Benoy Architects (Gran Bretagna), Ramboll (Danimarca) |
"MAPEI Distributor" | IBS-MAPEI |
Project Manager | Fara Abaspour (DEPA) |
"마페이 조정" | Tarana Daroogar, Mohammed Qunber, Daniele Spiga, IBS L.L.C. (EAU); Enrico Geronimi, Mapei SpA (Italia). |
"이 프로젝트와 관련된 모든 문서를 다운로드 할 수 있습니다"