"Yard" | 80.000 square meters floors of carpark |
---|---|
"Location" | Пекін, China |
"Subcategory" | PARKING |
"시공 시기" | 2017 |
"오픈 시기" | 2019 |
"Application" | supplying products to lay cementitious floors in the carpark of the west wing |
"Start and finish date" | 2019 |
"Application Type" | Cemetitious and resin floor coverings |
"Owner" | Shouzhong Investment Management Co. Ltd |
"Contractor company" | China Construction Eighth Engineering Bureau |
"Installer companies" | Henan Jian’An Waterproof and Anticorrosive Engineering Co.,Ltd |
"Project Manager" | Joint Design Team including Zaha Hadid Architects, ADP Ingénierie (ADPI), BIAD (Beijing Institute of Architectural Design) and CACC (China Airport Construction Group Corporation), Beijing Architectural Design and Research Institute |
"마페이 조정" | Guo Ming, Mapei Construction Materials (Guangzhou) Co. Ltd. |