"Yard" | Interior concrete surface preparation, leveling, installation of ceramic tile, wood flooring with sound-reduction and exterior large-format tiles |
---|---|
"Location" | Burlington, Canada |
"Subcategory" | HOTEL/INN |
"시공 시기" | 2021 |
"Application" | A variety of setting materials and innovative sound-reduction products from MAPEI were all part of completing a new-build complex of luxury residences and a four-star Marriott hotel on Lake Ontario’s north shore. |
"Start and finish date" | 2016/2021 |
"Application Type" | New building, Tile & stone installation systems |
"Owner" | The Rosseau Group Inc. and Pearle Hospitality (The Pearle) |
"Contractor company" | New Horizon Development Group |
"Installer companies" | Classic Tile Contractors Limited (Bridgewater) and Eden Tile-It (The Pearle) |
"MAPEI Distributor" | Dragona Flooring et Prosol Inc. |
"Credits" | Carole & Roy Timm Photography and Greg van Riel Photography |
"마페이 조정" | Gino D'Alesio |
"설명" | Architects: Gluckstein Design Planning (Bridgewater) and Studio Munge (The Pearle) |
"이 프로젝트와 관련된 모든 문서를 다운로드 할 수 있습니다"