System for red clay tennis courts

Sport and urban fittings
Tennis court
Pavimentazioni su terreni stabilizzati

Application steps

1
Sub-base drainage with
2
Pea-gravel
3
Base layer of the finished surface
4
Sub-surface layer with red clay
5
Red clay surface
6
Concrete edging with Vaga Rck37 structural concrete
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news