Cantiere | Floor required upgrading to meet Food & Hygiene standards |
---|---|
Località | Auckland, Nuova Zelanda |
Sottocategoria | INDUSTRIA |
Costruito nel | 2015 |
Inaugurato nel | 2015 |
Intervento | Chelsea Suger Refinery floor upgrade |
Inizio e fine dei lavori | 2015 |
Tipo di intervento | Posa di pavimenti |
Committente | Chelsea Suger Refinery |
Imprese esecutrici | Topcaot Specialist Coatings Ltd |
Distributore MAPEI | Mapei NZ Ltd |
Credits | Scott Lacey |
Direttore lavori | Peter Shepherd |
Altro | The existing floor of the processing plant was breaking down and was required to be bought back to Food and Hygiene standards as required by law. Mapefloor CPU Rt and Mapefloor CPU TC were applied. |