Brug in Romeinse stijl

Location icon Beugen, Olanda
Rif n°: 25
Categoria: EDIFICI, LUOGHI PUBBLICI

Cantiere

Cantiere Bouw Romeinse brug
Località Beugen, Olanda
Sottocategoria PONTE
Costruito nel 2016
Inaugurato nel 2016
Intervento Bruggen en viaducten
Inizio e fine dei lavori 2016
Tipo di intervento Nuove costruzioni
Committente Municipality Boxmeer
Imprese esecutrici AMC natural stones
Specialisti coinvolti nei lavori Haasnoot bruggen
Credits Haasnoot bruggen
Direttore lavori Johan van Heijster
Altro Construction of bridge in “roman style” in city Beugen
Prior to the construction of a new hospital and several business buildings in the area an archaeological investigation started in 1997. This was required by law. This investigation has lasted until this year (2016). The area has so much history that it received the status of a monument nowadays. It’s one of the largest archaeological research projects in the Netherlands. The area has been inhabited for over 4500 years, which is unique for the Netherlands. The history comes back to life. You can now walk through time; people will find burial mounds, a Roman path and this bridge from the middle-ages. The mediëval character of the bridge is directly clear because of the structure of the bridge and the materials that are used. It is obvious to visitors that they walk on historical grounds. The bridge opened in June 2016.

Bridge between the present and past
The first bridges were simple wooden logs or planks. Thereafter, copies of bricks were made, but in the first instance, only to support the timber. The stone arch bridge with cement was first constructed by the Romans. The ‘new’ bridge in Beugen with a length of 350 meters was designed, calculated and constructed by Haasnoot Bridges. The company Van Boekel delivered the complete concrete construction, including natural stone finish applied by AMC Natural Stone. The bonding of pieces of stone elements onto a concrete substrate, gives the bridge the Roman look and feel. The concrete is blasted and prepared in a proper way. The incline of horizontal concrete parts is done with Planitop Rasa & Ripara R4. All small holes in the concrete are closed with Elastorapid adhesive.

The natural stone pieces have been bonded with Elastorapid. The joints are grouted with Keracolor Brick. The undergournd concrete has been protected with Plastimul 2K Plus, against upcoming moisture.

Rimani in contatto

Iscriviti alla nostra newsletter per essere sempre aggiornato sulle novità Mapei