The runway was built thanks to 105,000 m³ of concrete formulated with specific Mapei admixtures for concrete.

Aeroparque Jorge Newbery is one of the two airports in the city of Buenos Aires. It is located near the banks of the River La Plata, not far from one of the most popular areas of the Argentine capital, the Palermo district. Inaugurated in 1945 and named “Aeroparque 17 de Octubre” to commemorate the day the Argentine people demonstrated in favour of Juan Perón, the name of the airport was changed, following the coup in 1955, to honour the Argentine aviator, Jorge Newbery.

Since then, work has been constantly ongoing to renovate and extend the airport: the terminal and runway were extended in 1960; the runway and two terminals were extended even further and direct connections with the city of Buenos Aires were built in 2007 to meet the demand from more frequent international flights; a new control tower was built and commissioned in 2018. 

In 2019, following the increase in the amount of traffic and to prevent saturating the airport, all international traffic was temporarily transferred to Ezeiza International Airport but, in May 2020, the airport started operating international flights again to Brazil, Paraguay, Bolivia, Chile and Peru.

Because of this move, an expansion project was launched in 2020 that lasted several months, before reopening the airport again in March 2021. The work carried out in this period led to the building of a new runway more than 2 km long.

In May the airport started operating international flights again and an expansion project was launched which included the building of a new runway more than 2 km long.

New runways for new flights

To handle the new volumes of traffic, the runway at the airport was rebuilt and extended.

Work started with the demolition of the surfaces of the existing runway, removal of all the debris and preparation of the ground. Thanks to the mixing plants and silos installed on site by UTE, the joint venture comprising Chediak and Ceosa commissioned to carry out the work, it was possible to create just the right mix design for the concrete required to build the new runway.

Mapei Argentina also contributed to the formulation of 105,000 m3 of concrete by devising a specific mix that, besides meeting specific performance requirements, was able to ensure high resistance to freeze and thaw cycles which the runway will be subject to in the next years.

The choice fell on Mapei admixtures which are suitable for making industrial floors and paving, including when exposed to the action of various atmospheric agents, such as those typically found at airports or  hydraulic works (dams, water channels, swimming pools, storage tanks).

The concrete runway is now in a position to handle the growing volumes of traffic using the airport, which, by the end of 2022, had already reached a total of 12.8 million passengers.

More info on MAPEPLAST N115

Project information

Yard
Aeroparque Jorge Newery
Location
Argentina
Subcategory
AIRPORT
Built in
2012
Opened in
2013
Application
Aeroparque Jorge Newery
Start and finish date
2012/2013
Application Type
Floor/wall coverings
Client
AEROPUERTOS ARGENTINA 2000
Contractor company
UMARE / HELPORT
Installer companies
FERNANDO COPARI
Architects
HELPORT
MAPEI Distributor
DIRECT SALES
Credits
DAVID LAHAM
Project Manager
HELPORT
Other
El Aeroparque Metropolitano Jorge Newbery es el aeropuerto de tráfico nacional y regional del Área Metropolitana de Buenos Aires, en Argentina. Es considerado como uno de los aeropuertos más modernos de Sudamérica.
En mayo de 2011 se firmó el contrato de la obra: Edificios III y IV; Aeroparque Jorge Newbery. Los Edificios 3 y 4 del Aeroparque Jorge Newbery es una obra de 35.000 m2 que consta de planta baja y primer piso para la extensión hacia el sur de las áreas de arribos y pre-embarque nacionales y 5 pisos superiores para oficinas. Cuenta además con 4 núcleos en plataforma con sus puentes a manga. La obra se inició en mayo 2011 y se inaugurará en octubre 2013. El monto de la obra es de $ 312.000.000
Tag
#infrastructures
Product Lines
Admixtures for concrete
You might also be interested in
Argentina strategic in challenges
Mapei around the World
8/1/2023
Argentina strategic in challenges

In the article we mentioned: