

All Articles
Begin exploring here. Choose tags and columns to find the content you are interested in or be inspired by the subject matter.

Projects
/
5/2/2024
PAC 2000A Conad Logistics Hub
The new 90,000 m² logistics centre in Montalto Uffugo improves PAC 2000A Conad's distribution network in Italy and is part of a research project with the University of Calabria to optimise logistics. Collaboration with Mapei has enabled innovative…

Focus
Concrete Flooring Solutions
Products
/
5/4/2023
A product system for jointless floors
Mapecrete System allows to obtain concrete surfaces with high dimensional stability, eliminating or reducing contraction joints

Projects
/
5/3/2023
SteelMed warehouse
Creating a highly resistant surface to the stresses of heavy loads.

Focus
Concrete Flooring Solutions
Projects
/
5/3/2023
Freight village, Bologna (Italy)
New jointless floor installed thanks to MAPECRETE SYSTEM in a logistics hub with three intermodal terminals.

Focus
Concrete Flooring Solutions
Projects
/
4/28/2023
Docks logistics centre
Using structural polymer fibers has enabled the amount of steel reinforcement in the floor to be reduced.

Focus
Concrete Flooring Solutions
Projects
/
4/28/2023
Storage yards in the port of Gdynia
A complete system for a project characterized by its sheer dimension and tight schedule.

Focus
Concrete Flooring Solutions
The expert's opinion
/
4/28/2023
So many advantages with fiber-reinforced concrete
Practicality, lower costs and less impact on the environment by using synthetic macro fibers.

Focus
Concrete Flooring Solutions
The expert's opinion
/
4/28/2023
The importance of new standards for the application of FRC
The fiber-reinforced concrete (FRC) sector has seen considerable development in recent years.

Focus
Concrete Flooring Solutions
The expert's opinion
/
4/27/2023
A full proposal with a new product line
Concrete flooring solutions: innovative solutions for durable concrete flooring.

Focus
Concrete Repair
Projects
/
7/22/2022
Mayoral logistics hub
A former industrial complex reconverted while maintaining the imposing 200 m structure intact.