Yard | Piscina comunale Tavernelle |
---|---|
Location | Tavernelle, Italy |
Subcategory | SWIMMING POOL |
Built in | 1992 |
Opened in | 1992 |
Application | Installation of klinker |
Application Type | Floor/wall coverings |
Client | Centro edile Umbro (271) |
Contractor company | F.lli Topo |
Architects | Ing. Mirabassi |