Bridge II/238 Kladno-Rozdělov 238-002

Location icon Kladno, Czech Republic
Ref #: 20095
Category: INFRASTRUCTURES

Construction

Yard new bridge
Location Kladno, Czech Republic
Subcategory ABBEY
Built in 2008
Opened in 2009
Application new bridge
Application Type Concrete restoration systems
Contractor company Skanska DS a.s., divize Praha
Installer companies Skanska DS a.s., divize Praha
Architects VPÚ DECO Praha
MAPEI Distributor Mapei s.r.o.
Project Manager Milan Pavlík

Product used for the project

ELASTOCOLOR PITTURA
ELASTOCOLOR PITTURA
Elastomeric, crack-bridging, permanently flexible, protective paint with high…
ELASTOCOLOR PRIMER
ELASTOCOLOR PRIMER
Solvent-based high-penetration consolidating primer to even out surfaces.
MAPEGROUT FAST-SET
MAPEGROUT FAST-SET
Fibre-reinforced, quick setting and hardening, compensated-shrinkage mortar for…
MAPEGROUT THIXOTROPIC ZERO
MAPEGROUT THIXOTROPIC ZERO
MAPEGROUT THIXOTROPIC ZERO is used for repairing horizontal and vertical…
This product replaces MAPEGROUT TISSOTROPICO
MAPESIL LM
MAPESIL LM
From the Mapei laboratories, the neutral silicone for sound sealing of stone,…
PRIMER MF
PRIMER MF
Two-component, solvent-free epoxy primer for consolidating and waterproofing…
MAPECOAT BS 1
MAPECOAT BS 1
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news