Brasserie du Cercle

Location icon Neuchâtel, Switzerland
Ref #: 4623
Category: PRODUCTION AND SERVICES

Construction

Yard Complete renovation of the floors in the restaurant and meeting room.
Location Neuchâtel, Switzerland
Subcategory Brewery
Application The herringbone parquet of the custom-made wood by FCB Industrie du Bois SA was installed with Ultrabond Eco S958 1K. The pattern is particularly suitable for emphasising the historic character of the building.
Start and finish date 2022
Application Type Installation of floors
Architects AASN Atelier d’Architecture de Saint-Nicolas SA
Specialists involved Association du Cercle National
MAPEI Coordination Marcello Maieron

Product used for the project

ECO PRIM GRIP PLUS
ECO PRIM GRIP PLUS
From Mapei laboratories, the multi-purpose universal primer with almost no…
PLANIPATCH XTRA
PLANIPATCH XTRA
PLANIPATCH XTRA is a fine-grained , ultra-fast drying thixotropic cementitious…
ULTRABOND ECO S958 1K
ULTRABOND ECO S958 1K
ULTRABOND ECO S958 1K is a 100% solvent-free (according to TRGS 610) silylated…

Keep in touch

Subscribe to our newsletter to get Mapei news