Drill a row of 12 mm diameter holes up to 12 cm apart and at least 12 cm above ground level. The depth of the holes should be around 5 cm less than the total thickness of the masonry and are used to inject the chemical barrier with an injection gun and cartridges or soft-cartridges of product with a lowpressure pump.