System for installing wood flooring on heated screeds with soundproofing

New building
Internal flooring
Installation of wooden flooring

Application steps

1
Concrete substrate
2
Soundproofing system
Unroll and apply the sheets, making sure there is an overlap of at least 5 cm to guarantee continuity in the soundproofing layer.
3
Soundproofing band
Apply the soundproofing strip along the bottom of the perimeter walls and around any elements passing through the screed.
4
Soundproofing tape
Seal overlaps between the sheets with the soundproofing tape and press down firmly with a rigid roller.
5
Vapour barrier 
6
Floor heating system
7
Cementitious screed
Position a series of levelling guides, spread the mix, carefully compact the mix and float-finish the surface. Minimum thickness over the heating elements: 3 cm; place metal reinforcing mesh at the mid-point or add MAPEFIBRE ST30 structural fibres.
8
Adhesive
Apply the adhesive with a suitable trowel.
9
Prefinished wooden floor
10
Adhesive
Apply the adhesive used to bond the skirting.
11
Sealant
Seal the skirting with Silwood in the same colour as the wood flooring.