System for installing ceramic tiles on a rendered façade

Old Building
Façade
Installation of ceramic tiles

Application steps

1
Render
Apply the product with a trowel or rendering machine with metal mesh embedded in the product fastened to the load-bearing substrate; the maximum total thickness should be 30 mm.
2
Adhesive
Apply the adhesive using the double-buttering method with a notched trowel suitable for the type and format of the tiles so that the back of the tiles is sufficiently wetted with adhesive.
3
Ceramic tiles
4
Grout
Once the adhesive has set, carefully fill the grouts to their full depth using a rubber trowel without leaving gaps or steps.
5
Sealant for window frame and stringer
MAPEFOAM + MAPESIL LM
Seal the corners, edges and expansion joints after inserting MAPEFOAM to set the correct depth.
You may be interested in Installation of ceramic tiles
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news