Kuala Lumpur International Airport 2 (KLIA2)

Location icon Sepang, Malaysia
Ref #: 60000028
Category: INFRASTRUCTURES

Construction

Yard Kuala Lumpur International Airport 2 (KLIA2)
Location Sepang, Malaysia
Subcategory AIRPORT
Built in 2013
Opened in 2013
Application Kuala Lumpur International Airport 2 (KLIA2)
Start and finish date 2013
Application Type Floor/wall coverings
Client Malaysia Airports Holding Berhad
Contractor company WCT Construction S/B & UEMC-Bina Puri
Installer companies Hon & Cheah Construction & Tiling Sdn Bhd / Sun-Trident Sdn Bhd
Architects Arkitek AAP
MAPEI Distributor Mapei Malaysia Sdn Bhd
Other MAPEI tiling installation in Kuala Lumpur International Airport 2 (KLIA2) Integrated Complex. Integrated complex comprises the transportation hub, Express Rail Link terminal, shopping mall, boarding and departure lounges and linkway passages. The Client wanted a top-of-the-range tile adhesive that is able to withstand the stresses of heavy traffic of people, trolleys and electric carts.

Product used for the project

KERACOLOR FF
KERACOLOR FF
Pre-blended, high-performance, polymer-modified cementitious mortar with…
KERAFLEX MAXI S1
KERAFLEX MAXI S1
High performance, deformable cementitious adhesive with extended open time and…

Keep in touch

Subscribe to our newsletter to get Mapei news