Yard | base of the Statue of Liberty |
---|---|
Location | Liberty Island, USA |
Subcategory | MONUMENT |
Built in | 1900 |
Opened in | 1900 |
Application | repair of the existing concrete floor and installation of granite tiles on the third level within the base and on a new exit ramp |
Start and finish date | 2004 |
Application Type | Installation of floors |
Client | Statue of Liberty Foundation |
Contractor company | Joseph A. Natoli Construction |
Installer companies | Phillipsburg Marble |
Architects | Highland Associates of New York |
MAPEI Distributor | Phillipsburg Marble |
Credits | Carolyn Anne Ryan |
Project Manager | Robert Barron |
Here you can download all documents related to this project