Play area - Mirdiff City Center

Location icon Dubai, United Arab Emirates
Ref #: 4877
Category: COMMERCIAL FACILITIES

Construction

Yard Flooring
Location Dubai, United Arab Emirates
Subcategory SHOPPING CENTER
Built in 2009
Opened in 2010
Application Substrate prepration
Application Type Installation of floors
Client MAF
Contractor company Plus Painting
Installer companies Plus Painting
MAPEI Distributor IBS-MAPEI

Product used for the project

MAPECEM
MAPECEM
Special quick-setting and drying (24 hours), controlled-shrinkage hydraulic…
MAPECEM PRONTO
MAPECEM PRONTO
Pre-blended, ready-to-use, quick-setting and drying (24 hours),…
PLANICRETE
PLANICRETE
Synthetic rubber latex to improve adhesion of cement mixes. TECHNICAL DATA:…
TOPCEM
TOPCEM
Special normal-setting, quick-drying (4 days), controlled-shrinkage hydraulic…
TOPCEM PRONTO
TOPCEM PRONTO
Ready-to-use, normal-setting, controlled-shrinkage mortar with high thermal…

Keep in touch

Subscribe to our newsletter to get Mapei news