Noumea Residence

Location icon Lignano Sabbiadoro, Italy
Ref #: 5110
Category: COMMERCIAL FACILITIES

Construction

Yard hotel restoration
Location Lignano Sabbiadoro, Italy
Subcategory HOTEL/INN
Built in 2012
Opened in 2013
Application ceramic installation and terraces waterproofing
Application Type Waterproofing systems
Client sig. Moratto Clemente
Contractor company Uni Costruzioni srl
Installer companies Zanon Enos; Graffito srl
Architects arch. Sessa Mariano
MAPEI Distributor Nosella Dante srl
Credits Sonia Murer
Project Manager sig. Moratto Clemente

Product used for the project

KERACOLOR GG
KERACOLOR GG
Pre-blended, high-performance polymer-modified cementitious mortar for grouting…
MALECH
MALECH
Water-based acrylic undercoat and bonding promoter with a smooth finish.…
MAPELASTIC
MAPELASTIC
Two-component, flexible cementitious mortar for waterproofing balconies,…
MAPESIL LM
MAPESIL LM
Neutral silicone mould-resistant sealant with BioBlock ® technology for stone…
PLANITOP FAST 330
PLANITOP FAST 330
Quick-setting, fibre-reinforced cementitious levelling mortar for internal and…
TRIBLOCK FINISH
TRIBLOCK FINISH
Three-component, epoxy-cementitious mortar for smoothing damp substrates.…
KERABOND
KERABOND
Product not available for this market,
contact us
MAPEBAND
MAPEBAND
Product not available for this market,
contact us
PURTOP 400 M
PURTOP 400 M
Product not available for this market,
contact us
363 - ADESILEX T SUPER
ADESILEX T SUPER
Product not available for this market,
contact us
74 - KERAFLEX MAXI S1
KERAFLEX MAXI S1
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news