Yard | The tunnel has a length of 24.5 feet (7.48 m) |
---|---|
Location | Fort Wayne, USA |
Subcategory | TUNNEL |
Built in | 2018 |
Opened in | 2021 |
Application | MAPEI’s Underground Tunnel Team (UTT) of experts helped with the tunneling operations and concrete repairs for the overflow of sewage and the cleanup of Fort Wayne’s rivers. |
Start and finish date | 2018/2022 |
Application Type | Products for underground construction (utt), Road maintenance and urban design |
Client | City of Fort Wayne, Indiana |
Contractor company | Salini-Lane Healy |
MAPEI Coordination | James Pinkley, Dr. Cristina Oñate and Tanner Murt |
Here you can download all documents related to this project