Yard | Tunnel realization |
---|---|
Location | Gräbern, Austria |
Subcategory | TUNNEL |
Built in | 2001 |
Opened in | 2003 |
Application | Tunnel realization and internal walls protection |
Application Type | Concrete restoration systems |
Client | ASFINAG/ÖSAG |
Project Manager | Ing. Sachs Östu/Stettin |
Here you can download all documents related to this project