Yard | pillars and decks, bridge motorway |
---|---|
Location | A13 Bologna-Padua, Italy |
Subcategory | BRIDGE, MOTORWAY |
Built in | 1970 |
Opened in | 1970 |
Application | supplying products for structural strengthening and concrete repair |
Start and finish date | 2021/2022 |
Application Type | Concrete restoration systems, Products for structural strengthening |
Client | Autostrade per l’Italia SpA |
Contractor company | Divisione Cantieri Stradali, Mario Iorio |
Installer companies | Divisione Cantieri Stradali |
Architects | Massimo Acanfora |
Specialists involved | Static tester: Prof. Andrea Prota Operational direction: Pasquale Staropoli, Ciro Valerio Executional safety coordinator: Gaetano Mascetta Technical-administrative testing: Alessandro Zamboni, Piero Indelli |
Project Manager | Giuseppe Turco (ASPI Bologna) |
MAPEI Coordination | Giulio Morandini, Gianpiero Peluso, Davide Demicheli, Corrado Castiglioni, Mapei SpA (Italy) |
Other | Site direction: Gennaro Sorrentino, Andrea Carraretto |
Here you can download all documents related to this project