Arabian Park Hotel - Expansion

Location icon Dubai, United Arab Emirates
Ref #: 42049
Category: TOURISM AND WELLNESS

Construction

Yard Internal and External Application
Location Dubai, United Arab Emirates
Subcategory HOTEL/INN
Built in 2018
Application INSTALLATION OF FLOORS
Start and finish date 2018/2020
Application Type Installation of floors
Contractor company BOWYER WICK
Installer companies STONE FACTORY
Architects EMIRATES ENGINEER

Product used for the project

FUGOLASTIC
FUGOLASTIC
Polymer liquid admix for KERACOLOR FF, KERACOLOR GG and KERACOLOR SF. TECHNICAL…
ISOLASTIC
ISOLASTIC
Elasticising latex mixed with KERABOND, KERABOND T and ADESILEX P10. When…
KERABOND T
KERABOND T
Cementitious adhesive with no vertical slip for ceramic tiles (thickness of…
KERACOLOR FF
KERACOLOR FF
Pre-blended, high-performance, polymer-modified cementitious mortar with…
ULTRACOLOR PLUS
ULTRACOLOR PLUS
High-performance, anti-efflorescence, quick-setting and drying polymer-modified…

Keep in touch

Subscribe to our newsletter to get Mapei news