Područje zahvata | ceiling of the passage tunnel |
---|---|
Lokacija | Sörenberg, Switzerland |
Podkategorija | TUNNEL |
Opis izvođenih radova | At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. |
Datum početka i završetka | 2023 |
Vrsta radova | Podzemne konstrukcije |
Izvođač radova | Gasser Felstechnik AG, Lungern |
Voditelj projekta | Rothornbahn Sörenberg |
Fotografije | Ramon Lehmann Fotografie |
MAPEI koordinator | Urs Wirth |