Rothorn Sörenberg

Location icon Sörenberg, Switzerland
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Ref #: 4658
Kategorija: INFRASTRUKTURA

Građevinski radovi

Područje zahvata ceiling of the passage tunnel
Lokacija Sörenberg, Switzerland
Podkategorija TUNNEL
Opis izvođenih radova At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Datum početka i završetka 2023
Vrsta radova Podzemne konstrukcije
Izvođač radova Gasser Felstechnik AG, Lungern
Voditelj projekta Rothornbahn Sörenberg
Fotografije Ramon Lehmann Fotografie
MAPEI koordinator Urs Wirth

Proizvod korišten na projektu

MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Jednokomponentna hidroizolacija za hidroizolaciju svih tipova betonskih…
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Nealkalni ubrzivač vezanja u prahu, za mlazne betone (torkrete)
LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not avalaible for this market,