Yard | Tunnel realization |
---|---|
Location | Tulln, Austria |
Subcategory | TUNNEL |
Built in | 2005 |
Opened in | 2007 |
Application | Tunnel Realization |
Application Type | Admixtures for concrete |
Client | ÖBB Infrastruktur Bau AG, Wien |
Contractor company | Fa. Schüring/Dhona |
Installer companies | Fa. OSTU; Fa. AST-Wolff Müller |
Project Manager | Hr. Dl Rauch; Ing. Stelzer |