Rothorn Sörenberg

Location icon Sörenberg, Ελβετία
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
# αναφ.: 4658
Κατηγορία: ΕΡΓΑ ΥΠΟΔΟΜΗΣ/ΜΕΤΑΦΟΡΩΝ

Κατασκευή

Γιάρδα ceiling of the passage tunnel
Τοποθεσία Sörenberg, Ελβετία
Υπο-κατηγορία ΣΗΡΑΓΓΑ
Εφαρμογή At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Ημερομηνία έναρξης και ολοκλήρωσης 2023
Τύπος εφαρμογής Υπογειεσ κατασκευεσ
Εταιρείες τεχνικών εγκατάστασης Gasser Felstechnik AG, Lungern
Διευθυντής έργου Rothornbahn Sörenberg
Μόρια Ramon Lehmann Fotografie
Συντονισμός MAPEI Urs Wirth

Προϊόν που χρησιμοποιείται στο έργο

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

Κρατήστε επαφή μαζί μας

Εγγραφείτε στο ενημερωτικό δελτίο μας για να λαμβάνετε τις ειδήσεις της Mapei