Yard | Renovation and change of use of the premises of the physiotherapy practice. |
---|---|
Location | Bex, Switzerland |
Subcategory | HOSPITAL |
Application | The floor subfloors had to be levelled before installation. This was achieved by means of spot filling, vapour retarders and final smoothing. In addition, 320m² of LVT flooring was laid with Ultrabond Eco 4 LVT. |
Start and finish date | 2022 |
Application Type | Installation of floors |
Architects | JME architecture SA |
Specialists involved | Start.Physio |
MAPEI Coordination | Marcello Maieron |