Campus Donaufeld

Location icon Austria
Ref #: 201101
Category: PUBLIC BUILDINGS AND PLACES

Construction

Yard Donaufelderstraße 77
Location Austria
Subcategory SCHOOL
Built in 2010
Opened in 2011
Application Fliesen- und Natursteinverlegung
Application Type Floor/wall coverings
Client GESIBA
Installer companies Olida Ceramic GesmbH
Architects Gangoly & Kristiner
Credits Fares Maghsood

Additional Attachments

Here you can download all documents related to this project

Product used for the project

ADESILEX P9
ADESILEX P9
High-performance cementitious adhesive with no vertical slip and extended open…
KERAFLEX MAXI S1
KERAFLEX MAXI S1
TECHNICAL DATA: Pot life of mix: more than 8 hours. Open time: 30 minutes.…
MAPEGUM WPS
MAPEGUM WPS
COVERAGE: approx. 1.5 kg/m2 per mm of thickness.
MAPESIL AC
MAPESIL AC
Pure, mould-resistant, acetic silicone sealant with BioBlock ® technology for…
PRIMER G
PRIMER G
TECHNICAL DATA: Consistency: liquid. Colour: blue. Dilution rate: from 1:1 to…
KERAFLEX EXTRA S1 ZERO
KERAFLEX EXTRA S1 ZERO
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news