A full Mapei system forms part of the new Braywick Leisure Centre – a £33 million state-of-the-art facility designed by Plymouth-based BRL Architects. The new iconic Centre in Maidenhead replaces the Magnet Leisure Centre; it combines recreational, leisure and cultural facilities on a larger footprint, whilst using 70% less energy.  The project was delivered by Wates Construction who worked closely with engineering consultants, Hoare Lea, to meet the sustainability targets.

Situated on the edge of Braywick Nature Reserve, under a striking sweeping roof, the centre features a 400m2 internal covered top lit ‘street’, from which all areas are accessed.  Facilities include a 10-lane pool and trainer pool – each with spectator seating - a 200 station gymnasium, artisan café, dance studio and 2000m2 sports hall.  As well as providing a local community hub, the centre also hosts national and international events.  Mapei products were used from early design stage to completion, in the installation of floor and wall coverings, for concrete repairs, new construction, tanking, waterproofing and structural reinforcement. 

The Mapei specification included Eporip solvent-free epoxy adhesive for construction joints, bonding of screeds and localised concrete repair.  Within pool areas, changing villages and corridors, products used included Mapei Topcem fast drying hydraulic binder, Planitop Fast 330 quick-setting, fibre-reinforced mortar, Mapelastic Smart highly flexible, cementitious waterproof membrane, Mapetex Sel non-woven, macro-holed polypropylene reinforcing fabric, Keraflex Maxi S1 deformable cementitious adhesive and Keraquick S1 quick-setting, deformable cementitious adhesive. 

Mapei Ultracolor Plus anti-efflorescence, quick-setting and drying polymer-modified grout – featuring water-repellent DropEffect® and mould-resistant BioBlock® - was used for all tiled areas, along with Mapesil AC pure mould-resistant acetic silicone sealant for all movement joints.  Other products specified included Mapemortar HB R3 high build, shrinkage compensated repair mortar.

Within the street area, Keraquick XL Fibrelite fibre reinforced cement based rapid setting adhesive was used for the installation of tiles, along with Keraflex flexible cementitious adhesive.

For floor installation in the sports hall and sport stores, Mapei systems included Eco Prim T Plus solvent-free low odour all-purpose primer, Mapeproof One Coat single-coat epoxy surface damp proof membrane and Ultraplan Renovation Screed 3240 - a fibre reinforced self-levelling compound.  Other products included Mapegrout SV quick-setting and hardening, compensated-shrinkage hi-flow mortar for spectator seating and balustrade bases and Mapefill GP non-shrink grout for spectator seating areas.

 

tile adhesive tiles Pool Flooring interior exterior Project Reference Case Study

Products mentioned in the article

MAPEFILL GP
MAPEFILL GP
Mapefill GP is a pre-blended powdered grout based on high strength cement, graded aggregates with 1 mm diameter and special additives with…
MAPEPROOF ONE COAT
MAPEPROOF ONE COAT
The product is easy to use and dries within 6 hours in the following temperatures: +10°c 5-6 hours +23°c 3-4 hours +30°c 2-3 hours
ECO PRIM T PLUS
ECO PRIM T PLUS
Universal acrylic primer for all absorbent and non-absorbent substrates
KERAQUICK XL FIBRELITE
KERAQUICK XL FIBRELITE
Where to use: Interior and exterior bonding of ceramic and porcelain tiles and mosaics and natural stone materials that are not sensitive…
MAPEMORTAR HB R3
MAPEMORTAR HB R3
A medium strength, high build, shrinkage compensated repair mortar for repairing concrete.
MAPESIL AC
MAPESIL AC
Pure, mould-resistant, acetic silicone sealant with BioBlock ® technology for movements up to 25%.
KERAQUICK S1
KERAQUICK S1
High-performance, quick-setting, deformable cementitious adhesive with no vertical slip for ceramic tiles and stone material stable in the…
KERAFLEX MAXI S1
KERAFLEX MAXI S1
TECHNICAL DATA: Pot life of mix: more than 8 hours. Open time: 30 minutes. Waiting time before grouting: – on walls: 4-8 hours; – on…
MAPETEX SEL
MAPETEX SEL
Non-woven, macro-holed polypropylene fabric for reinforcing Mapei waterproof membranes eg Mapelastic Smart, Mapelastic Turbo. Improves…
PLANITOP FAST 330
PLANITOP FAST 330
Quick-setting, fibre-reinforced cementitious levelling mortar for internal and external floors and walls, applied in layers from 3 to 30 mm…